{"id":99315,"date":"2019-12-04T08:42:37","date_gmt":"2019-12-04T16:42:37","guid":{"rendered":"https:\/\/lifeboat.com\/blog\/2019\/12\/this-company-says-itll-build-an-entire-skyscraper-in-90-days"},"modified":"2019-12-04T08:42:37","modified_gmt":"2019-12-04T16:42:37","slug":"this-company-says-itll-build-an-entire-skyscraper-in-90-days","status":"publish","type":"post","link":"https:\/\/lifeboat.com\/blog\/2019\/12\/this-company-says-itll-build-an-entire-skyscraper-in-90-days","title":{"rendered":"This Company Says It\u2019ll Build an Entire Skyscraper in 90 Days"},"content":{"rendered":"<p><\/p>\n<p><iframe style=\"display: block; margin: 0 auto; width: 100%; aspect-ratio: 4\/3; object-fit: contain;\" src=\"https:\/\/www.youtube.com\/embed\/J8m_XURNbKY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope;\n   picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<p>The reason why the process is so incredibly fast is because the excavation and laying of the foundation on-site can be completed at the same time as the construction of the modules. It would also require nearly 70 percent less on-site, labor according to <em>The<\/em> <em>B1M<\/em>.<\/p>\n<p>In fact, most of the segments of Marriott\u2019s planned hotel are being built in Poland and then shipped across the Atlantic. The rooms will be ready made according to Marriott, including bedding and even toiletries.<\/p>\n<p>\u201cWe wanted to demonstrate that modular building can do more than just harness the efficiencies of the factory,\u201d Danny Forster, owner of the firm that designed the tower, said in an <a href=\"https:\/\/news.marriott.com\/2019\/04\/worlds-tallest-modular-hotel-set-to-rise-in-new-york-city-this-fall-highlighting-marriott-internationals-vision-to-disrupt-the-way-buildings-get-built\/\">April press release<\/a>. \u201cIt can produce a graceful and iconic tower. And yes, it can do so at the rate of an entire floor a day.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The reason why the process is so incredibly fast is because the excavation and laying of the foundation on-site can be completed at the same time as the construction of the modules. It would also require nearly 70 percent less on-site, labor according to The B1M. In fact, most of the segments of Marriott\u2019s planned [\u2026]<\/p>\n","protected":false},"author":413,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-99315","post","type-post","status-publish","format-standard","hentry","category-habitats"],"_links":{"self":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/99315","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/users\/413"}],"replies":[{"embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/comments?post=99315"}],"version-history":[{"count":0,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/99315\/revisions"}],"wp:attachment":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/media?parent=99315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/categories?post=99315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/tags?post=99315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}