{"id":189970,"date":"2024-05-24T01:26:23","date_gmt":"2024-05-24T06:26:23","guid":{"rendered":"https:\/\/lifeboat.com\/blog\/2024\/05\/flos-new-ultra-dc-fast-chargers-can-charge-evs-to-80-in-15-minutes"},"modified":"2024-05-24T01:26:23","modified_gmt":"2024-05-24T06:26:23","slug":"flos-new-ultra-dc-fast-chargers-can-charge-evs-to-80-in-15-minutes","status":"publish","type":"post","link":"https:\/\/lifeboat.com\/blog\/2024\/05\/flos-new-ultra-dc-fast-chargers-can-charge-evs-to-80-in-15-minutes","title":{"rendered":"FLO\u2019s new Ultra DC fast chargers can charge EVs to 80% in 15 minutes"},"content":{"rendered":"<p><a class=\"aligncenter blog-photo\" href=\"https:\/\/lifeboat.com\/blog.images\/flos-new-ultra-dc-fast-chargers-can-charge-evs-to-80-in-15-minutes2.jpg\"><\/a><\/p>\n<p>The first <a href=\"https:\/\/www.flo.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">FLO<\/a> Ultra DC fast chargers are rolling off the assembly line at the company\u2019s Auburn Hills, Michigan, factory \u2013 and they\u2019re pretty powerful.<\/p>\n<p>The 320 kW FLO Ultra DC fast chargers feature a dual-port power configuration. The EV charging company designed them to comply with the federal government\u2019s National Electric Vehicle Infrastructure Program (NEVI) standards and the Buy America Act, including 98% uptime. They can charge most EVs to 80% in just 15 minutes.<\/p>\n<p>The FLO Ultra DC fast chargers feature the new FLO motorized cable management system. The <a href=\"https:\/\/c212.net\/c\/link\/?t=0&l=en&o=4173783-1&h=4058731391&u=https%3A%2F%2Fwww.flo.com%2Fnews%2Feasing-the-load%2F\" target=\"_blank\" rel=\"noreferrer noopener\">EZLift system<\/a> is designed to keep cables off the ground and provide extended reach, allowing the cable to reach EVs no matter where the port is located. The motorized system makes the cables feel lighter and easier to maneuver.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first FLO Ultra DC fast chargers are rolling off the assembly line at the company\u2019s Auburn Hills, Michigan, factory \u2013 and they\u2019re pretty powerful. The 320 kW FLO Ultra DC fast chargers feature a dual-port power configuration. The EV charging company designed them to comply with the federal government\u2019s National Electric Vehicle Infrastructure Program [\u2026]<\/p>\n","protected":false},"author":367,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1490,17,1491],"tags":[],"class_list":["post-189970","post","type-post","status-publish","format-standard","hentry","category-government","category-sustainability","category-transportation"],"_links":{"self":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/189970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/users\/367"}],"replies":[{"embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/comments?post=189970"}],"version-history":[{"count":0,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/189970\/revisions"}],"wp:attachment":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/media?parent=189970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/categories?post=189970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/tags?post=189970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}