{"id":149427,"date":"2022-11-04T01:22:14","date_gmt":"2022-11-04T06:22:14","guid":{"rendered":"https:\/\/lifeboat.com\/blog\/2022\/11\/terawatt-developing-i-10-electric-corridor-the-first-network-of-electric-heavy-duty-charging-centers"},"modified":"2022-11-04T01:27:17","modified_gmt":"2022-11-04T06:27:17","slug":"terawatt-developing-i-10-electric-corridor-the-first-network-of-electric-heavy-duty-charging-centers","status":"publish","type":"post","link":"https:\/\/lifeboat.com\/blog\/2022\/11\/terawatt-developing-i-10-electric-corridor-the-first-network-of-electric-heavy-duty-charging-centers","title":{"rendered":"TeraWatt Developing I-10 Electric Corridor, the First Network of Electric Heavy-Duty Charging Centers"},"content":{"rendered":"<p><a class=\"aligncenter blog-photo\" href=\"https:\/\/lifeboat.com\/blog.images\/terawatt-developing-i-10-electric-corridor-the-first-network-of-electric-heavy-duty-charging-centers2.jpg\"><\/a><\/p>\n<p>The I-10 Electric Corridor will consist of multiple facilities, called TeraWatt Charging Centers, that will be spread across California, Arizona, and New Mexico. TeraWatt Charging Centers will be purpose-built to serve heavy-duty and medium-duty electric fleets, featuring dozens of direct current (DC) fast chargers, pull-through charging stalls, on-site driver amenities, and reliable operations including resiliency generation and zero carbon electricity options. TeraWatt will offer access to these sites both for the purposes of long-haul and local electric trucking operations.<\/p>\n<hr>\n<p>SAN FRANCISCO, CA \u2013 October 20, 2022 \u2013 TeraWatt Infrastructure, a company powering electrified fleets with the most reliable network of charging centers, today announced it is developing the first network of high-powered charging centers for heavy-duty and medium-duty electric trucks along the Interstate 10 (I-10) highway, stretching from the Port of Long Beach \u2013 Los Angeles, California to the El Paso, Texas area. By investing in the necessary charging infrastructure, TeraWatt is enabling and accelerating the transition to zero-emission long-haul freight.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The I-10 Electric Corridor will consist of multiple facilities, called TeraWatt Charging Centers, that will be spread across California, Arizona, and New Mexico. TeraWatt Charging Centers will be purpose-built to serve heavy-duty and medium-duty electric fleets, featuring dozens of direct current (DC) fast chargers, pull-through charging stalls, on-site driver amenities, and reliable operations including resiliency [\u2026]<\/p>\n","protected":false},"author":534,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1491],"tags":[],"class_list":["post-149427","post","type-post","status-publish","format-standard","hentry","category-transportation"],"_links":{"self":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/149427","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/users\/534"}],"replies":[{"embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/comments?post=149427"}],"version-history":[{"count":1,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/149427\/revisions"}],"predecessor-version":[{"id":149430,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/149427\/revisions\/149430"}],"wp:attachment":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/media?parent=149427"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/categories?post=149427"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/tags?post=149427"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}