{"id":131948,"date":"2021-12-07T21:24:15","date_gmt":"2021-12-08T05:24:15","guid":{"rendered":"https:\/\/lifeboat.com\/blog\/2021\/12\/phase-3-of-the-worlds-largest-offshore-wind-farm-moves-forward"},"modified":"2021-12-07T21:24:15","modified_gmt":"2021-12-08T05:24:15","slug":"phase-3-of-the-worlds-largest-offshore-wind-farm-moves-forward","status":"publish","type":"post","link":"https:\/\/lifeboat.com\/blog\/2021\/12\/phase-3-of-the-worlds-largest-offshore-wind-farm-moves-forward","title":{"rendered":"Phase 3 of the world\u2019s largest offshore wind farm moves forward"},"content":{"rendered":"<p><a class=\"aligncenter blog-photo\" href=\"https:\/\/lifeboat.com\/blog.images\/phase-3-of-the-worlds-largest-offshore-wind-farm-moves-forward2.jpg\"><\/a><\/p>\n<p>British utility SSE and Norwegian energy giant Equinor announced late last week that they have secured financing to proceed with the construction of the $3.98 billion Dogger Bank C offshore wind farm off England\u2019s northeast coast.<\/p>\n<p>Dogger Bank C offshore wind farm, along with Dogger Bank A and Dogger Bank B, is due to become the <a href=\"https:\/\/doggerbank.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">largest offshore wind farm in the world<\/a> upon completion, with an installed capacity of 3.6 gigawatts (GW). Each phase is 1.2 GW.<\/p>\n<p>Dogger Bank C will generate around 6,000 gigawatt hours (GWh) of electricity a year when completed in 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>British utility SSE and Norwegian energy giant Equinor announced late last week that they have secured financing to proceed with the construction of the $3.98 billion Dogger Bank C offshore wind farm off England\u2019s northeast coast. Dogger Bank C offshore wind farm, along with Dogger Bank A and Dogger Bank B, is due to become [\u2026]<\/p>\n","protected":false},"author":662,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1497],"tags":[],"class_list":["post-131948","post","type-post","status-publish","format-standard","hentry","category-energy"],"_links":{"self":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/131948","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/users\/662"}],"replies":[{"embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/comments?post=131948"}],"version-history":[{"count":0,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/posts\/131948\/revisions"}],"wp:attachment":[{"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/media?parent=131948"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/categories?post=131948"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lifeboat.com\/blog\/wp-json\/wp\/v2\/tags?post=131948"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}